Jeffrey Carr Construction is an Equal Opportunity Employer


 

 

Stark State College –
Presidential Area Remodel


Description:
JCCI is the Lead Single Prime General Contractor.

General Contract:
$286,000

Scheduled Completion:
August 2018




ODOT Full Service Maintainence Facility – Medina Outpost

Description:
JCCI is the Lead Single Prime Contractor for the Medina County Full Service Maintenance Facility for the Ohio Department of Transportation. The site will include multiple buildings including a 37,000 SF Pre-Engineered Metal Building Office/Truck Storage/Vehicle Maintenance/Wash Bay Facility along with a Mixing Structure Building and Cold Storage Building. The Project also includes an Above Ground Fuel Island, Brine Area and other site improvements.

General Contract:
$9,094,000

Scheduled Completion:
June 2019

 

Ohio State University –
Conrad Hall


Description:
JCCI is the Lead Single Prime Contractor for 5,200 SF Renovation to Existing 2nd Floor Science Labs at Conard Hall . The project includes General Selective Demolition of Existing Spaces, New Finishes including Sheet Flooring, Paint and Ceilings along with New Upgraded Mechanical and Electrical Systems.

General Contract:
$1,432,955

Scheduled Completion:
August 2018




ODOT Full Service Maintainence Facility – Massillon Outpost

Description:
JCCI is the Lead Single Prime Contractor for New Massillon District Outpost Facility for the Ohio Department of Transportation. The Site will include multiple buildings including an 18,000 SF Pre-Engineered Metal Building Truck Storage and Wash Bay Facility along with a Salt Storage/Mixing Structure Building and a Cold Storage Building. The Project also includes an Above Ground Fuel Island, Brine Area and Other Site Improvements.

General Contract:
$5,892,300

Scheduled Completion:
March 2019

 

ODOT Full Service Maintainence Facility – Rootstown Outpost

Description:
JCCI is the Lead Single Prime Contractor for the Portage County Full Service Maintenance Facility for the Ohio Department of Transportation. The site will include multiple buildings including a 37,000 SF Pre-Engineered Metal Building Office/Truck Storage/Vehicle Maintenance/Wash Bay Facility along with a Mixing Structure Building and Cold Storage Building. The Project also includes an Above Ground Fuel Island, Brine Area and other site improvements.

General Contract:
$7,186,900

Scheduled Completion:
May 2019





Massillon City School District – Track and Field Facility

Description:
New "state of the art" facility for Massillon City Schools. Includes: synthetic track for football and soccer; synthetic turf running track; new bleachers; fencing; landscaping and seeding; site lighting; specialty areas (long jumps/shot put/pole vault).

General Contract:
$2,824,739

Scheduled Completion:
May 2018

 

Edgewood Middle School – Renovations and
Media Center Addition


Description:
Jeffrey Carr Construction, Inc. served as the Lead Prime Contractor for the Additions and Renovations at Edgewood Middle School on behalf of the Wooster City Schools and the Boys and Girls Club of Wooster. The $2,163,000 single prime project included a 4,000 SF Addition to the Middle School Media Center for the purpose of becoming a Multi-Purpose and Administrative Office Area for the Boys and Girls Club. In addition, there was approximately 10,000 SF of Interior Renovations to the Student Dining and Media Center Areas for the School District. Included in the Project Scope was Construction of a New Plaza with Planters, Cast Stone Benches, Stamped Concrete and a New Middle School Entrance Vestibule.

General Contract:
$2,163,000

Completed:
Spring 2017





Kent State University –
Taylor Hall Renovation


Description:
Jeffrey Carr Construction Inc. served as the Lead General Contractor on the $7,307,000 Single Prime Construction Renovation of Existing 4-Story 65,000 SF Taylor Hall on the Campus of Kent State University. The 6 month fast track project scope of work included Asbestos Abatement and Selective Demolition of the Existing Building including enlarging and replacing the existing Elevator. Other upgrades included new Flooring, Painting, Ceiling, Lighting and Mechanical Systems throughout the building. Included in the Scope was a 7,000 SF of the MACC Annex Facility. The project was completed in August 2017 in time for Fall Semester and now houses the Visual Communications Department and Communication Studies.

General Contract:
$7,307,000

Completed:
August 2017

 

Kent State University –
Stark Campus
Sciences Building


Description:
This project is the construction of a new 41,140 SF 3 story facility and renovation of approximately 5,250 SF of the existing Main Hall East Wing. The new building will provide classrooms and laboratories for biology, physics, geology and nursing. It will also include general and computer classrooms, faculty offices and a student cyber lounge.

Design by BHDP Architecture

General Contract:
$11,447,000

Completed:
July 2015



Kent State University –
Eugene Tolloty Technology Business Incubator


Description:
This project is a 27,000 SF two story facility that was a collaboration between Kent State University (Tuscarawas) and the Tuscarawas Community Involvement Commission (CIC). The LEED certified facility was funded in part by the U.S. Economic Development Administration (EDA) and will serve as the main headquarters for the CIC as they attract business to join the Tuscarawas Regional Tech Park.


Design by Poggemeyer Design Group

General Contract:
$5,015,000

Completed:
June 2014

 

ODOT - West 114th Salt Facility

Description:
This project consisted of a 137’ x 70’ salt storage building with fabric covered roof system and a 20’ x 40’ single bay storage building with HVAC, lighting and a new electrical service. Site improvements included new asphalt pavement, fencing and a new automatic gate.


General Contract:
$1,000,000

Completed:
July 2014



United States Citizenship & Immigration Services

Description:
JCCI served as Lead General Contractor for this $1,523,583 project administered by the General Administrative Services (GSA) at the John W. Peck Federal Building in Cincinnati, Ohio. The project was a 12,500 SF 4th Floor Renovation and 2,500 SF 1st Floor Renovation including new offices, conference rooms and training rooms for the U.S. Customs and Immigration Services (USCIS).


Design by Moody Nolan

General Contract:
$1,523,583

Completed:
September 2014

  Kent State University – Stark Maintenance Building Envelope Repairs and Roof Replacement

Description:
This project consists of exterior masonry replacement/repairs, exterior painting, replacement of exterior sectional doors and mandoors, install new roof membrane with ribs and snow guards.


Design by SOL/Harris Day

General Trades Contract:
$270,000

Completed:
November 2014


Kent State University – Stark Campus Sciences Building

Description:
This project is the construction of a new 41,140 SF 3 story facility and renovation of approximately 5,250 SF of the existing Main Hall East Wing. The new building will provide classrooms and laboratories for biology, physics, geology and nursing. It will also include general and computer classrooms, faculty offices and a student cyber lounge.


Design by BHDP Architecture

General Contract:
$11,447,000

Completed:
July 2015

  St. Michael the Archangel Parish Addition & Renovations

Description:
This project is an 11,200 sf addition and 2000 sf of renovations to the existing Parish. The new addition will provide new office space for the staff and the lower level is future preschool space. The project requires auger cast piles and underpinning of the existing facility.


Design by SOL/Harris Day

General Trades Contract:
$1,826,000

Completed:
April 2015



ODOT Wayne County Maintenance Facility

Description:
This project consisted of five (5) separate buildings including an Office & Maintenance Facility; a Truck Storage Facility; a Salt Storage Structure; a Mixing Structure; and a Cold Storage Building. Site improvements includes a Fuel Island; Brine/Calcium Area; and a Monopole for ODOT Radio Transmitting & GPS Systems.

Design by Jerome M. Scott, Architects, Inc.

General Trades Contract:
$6,002,000

Completed:
May 2013
  Stark State College
North Academic Building


Description:
Project is a 52,500 SF addition to the Health Science Building at Stark State College in North Canton, Ohio. Project will also involve Construction of a Pedestrian Walkway crossing Mega Avenue.

Design by FMD Architects

General Trades Contract:
$5,450,000

Completed:
April 2012


Clark State Performing Arts Center Expansion

Description:
This project is a 27,555 SF expansion of the Performing Arts Center at Clark State Community College in Springfield, Ohio.

Design by Lincoln Studio Architects

General Trades Contract:
$3,200,00

Completed:
July 2011
  Stark State College/The Timken Company-Wind Research & Development Center

Description:
This project is a 17,000SF facility that is a collaboration between Stark State College & The Timken Company. The project included a high bay area equipped with a 50 ton crane and test machinery. The project is a LEED “certified” facility.

Design by SOL/Harris Day

General Trades Contract:
$3,250,000

Completed:
November 2012


Stark State College
New Business Entrepreneur Building-Phase I


Description:
This project is a 40,000 SF facility that consisted of a lecture hall, atrium, marketing & financial labs, captioning & computer labs, classrooms, testing and resource centers, and business faculty offices. The building is a three story structural steel, masonry and reinforced concrete structure. The project is a LEED “Silver” standards facility that includes a solar domestic hot water system.

Design by SOL/Harris Day

General Trades Contract:
$3,500,000

Completed:
December 2011
  Akron-Canton Airport Rescue & Fire Fighting/Maintenance Facility

Description:
This project consists of a 22,000 sf Pre-Engineered Metal Building with a 5 ton crane and three 1 ton jib cranes. Attached to the Metal Building is a 13,000 SF conventional masonry facility with a standing seam roof system. The sitework consisted of hauling 100,000 CY of fill material to the site, relocating high voltage electric line, new entrance road, airfield access road, concrete parking and apron areas, storm sewer, waterline, sanitary sewer, site lighting, fencing, airfield lighting and modifications to the existing ARFF communications.

Design by RS&H Ohio, Inc.

General Contract:
$6,300,000

Completed:
November 2012


Westlake High School

Description:
JCCI was the General Trades Contractor for the construction of a new 280,000 SF new high school for the Westlake City School District. The project also, included renovations to the Preforming Arts Center.

Design by MKC Associates, Inc.

General Trades Contract:
$11,126,000

Completed:
OMarch 2014
  Towpath Trail YMCA

Description:
This project was the construction an addition to the existing facility consisting of a new 4,800 SF Indoor Pool and a 1,520 SF Child Care facility.

Design by Scheeser Buckley Mayfield, LLC

General Contract:
$1,127,000

Completed:
January 2014


Army National Guard Armed Forces Reserve Center & Field Maintenance Shop

Description:
This was a $15,460,000 project consisting of the construction of three separate buildings for the Ohio Army National Guard in Mansfield, Ohio. The project is administered under a Single Prime Contract with Jeffrey Carr Construction as General Contractor and Quality Control Manager.

Design by Burns & McDonnell Architects

General Trades Contract:
$15,460,000

Completed:
February 2011
  Delaware YMCA

Description:
Project is a Single Prime Construction of a new 85,400 SF YMCA Community Center for the City of the Delaware in Delaware, Ohio. The project included two (2) swimming pools, exercise area, gymnasium, locker rooms, climbing wall and a walking track. The site included a new pond and walk path.

Design by Poggemeyer Design Group

General Trades Contract:
$12,800,000

Completed:
November 2011


Bucyrus Elementary Renovations & Addition

Description:
This project required the renovation of a 100 year old, 100,000 SF school building and a 22,000 SF addition. The renovations included masonry restoration structural upgrades, new roof system , replacement of all doors and windows and new mechanical and electrical systems.

Design by Fanning Howey & Associates

General Trades Contract:
$7,030,000

Completed:
August 2009
  Communication Facilities

Description:
Jeffrey Carr Construction Inc. has constructed over 600 communication facilities for private carriers and various governmental agencies, over the mid–west United States
.


Service Stations

Description:
Jeffrey Carr Construction has built over 100 service station projects since 1985.
  Stark State College
Gateway Center


Description:
Jeffrey Carr Construction Inc. is the Lead General Contractor on New Stark State Gateway Center Project. The project consists of 10,500 SF Addition and 4,500 SF Renovation of the Existing Entrepreneurial Building on campus.

Design by Hasenstab Architects, Inc.

General Trades Contract:
$2,126,100

Scheduled Completion:
November 2015